NIT No.:2023_NHPC_728007_1
Design & Engineering through international consultant (RCC Dam), Construction Planning and Construction Monitoring for Dibang Multi Purpose Project
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 13-01-2023 | 31-01-2023 |
| Bid Opening Date | 31-01-2023 |
| Download Document |
Download PDF
( डाउनलोड | 140.62 KB | PDF | एडोबी रीडर या ब्राउज़र से खोलें) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| 2023_NHPC_728007_1 | Design & Engineering through international consultant (RCC Dam), Construction Planning and Construction Monitoring for Dibang Multi Purpose Project | 31-01-2023 | 31-01-2023 |
| Design & Engineering through international consultant (RCC Dam), Construction Planning and Construction Monitoring for Dibang Multi Purpose Project | Login to Download | ||
| Corrigendum Details | Civil Maintenance of Dam and Power House area, DTGH, Pothead Yard, Surge Shaft and TRT Area of Uri-II Power Station |
| Corrigendum Extend Date | 01-01-1970 |
| Corrigendum Extend Expiry Date | 01-01-1970 |
| Download Document | Download |
|---|
No corrigendums available for this tender.