NIT No.:2023_NHPC_728007_1

Design & Engineering through international consultant (RCC Dam), Construction Planning and Construction Monitoring for Dibang Multi Purpose Project

Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date: Bid Submission End Date:
01-01-1970 01-01-1970
Bid Opening Date: 01-01-1970
Download Document Download PDF (opens in a new tab, PDF)
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. Title Bid Opening Date End Date
2023_NHPC_728007_1 Design & Engineering through international consultant (RCC Dam), Construction Planning and Construction Monitoring for Dibang Multi Purpose Project 31-01-2023 31-01-2023
Design & Engineering through international consultant (RCC Dam), Construction Planning and Construction Monitoring for Dibang Multi Purpose Project Login to Download
Corr-1
Corrigendum Details Civil Maintenance of Dam and Power House area, DTGH, Pothead Yard, Surge Shaft and TRT Area of Uri-II Power Station
Corrigendum Extend Date 01-01-1970
Corrigendum Extend Expiry Date 01-01-1970
Download Document Download