PAKAL DUL (JV)



The Pakal Dul Hydro Electric Project (1000 MW) is proposed on river Marusudar, a tributary of Chenab river, located in Kishtwar district of Union Territory of Jammu & Kashmir. The project is envisaged as a storage scheme.
Feature List
Feature Name Description
Location Village Drangdhuran in district Kishtwar of Union Territory of Jammu & Kashmir
Approach Nearest Railhead – Udhampur (220 Km.) Nearest Airport- Jammu (285 Km.)
River Chenab
Capacity 1000 MW (4X 250 MW)
Design Energy 3230 MU (in a 90% dependable year)
Estimated Project Cost Rs. 8112.12 crore (March. 2013 Price Level)
Date of Commercial Operation (COD) SEP 2026 (Anticipated)
TECHNICAL FEATURES
Dam167 m High Concrete Face Rock Fill Dam (CFRD). India’s highest CFRD
Diversion Tunnel859m long, 11m dia. River Diversion successfully completed on 01.11.2021.
HRT2 Nos, 7.2 m dia. Horse Shoe (2.25 km Drill and Blast excavation)/Circular shaped (7.35 km TBM excavation) – Total Length -  9.6 Km each.
Surge Shaft2 nos. 200m deep, 13m dia, vertical 
Pressure Shaft4 nos. - 291m deep, 3.9m dia, Vertical
Power HouseUnderground (166m ×20.20m × 50.50m); 4 units of 250 MW each  (1000 MW) – Francis turbine Location - near village Dul about 26 kms from Kishtwar
Rated Head397m
Project StatusUnder Construction