The Pakal Dul Hydro Electric Project (1000 MW) is proposed on river Marusudar, a tributary of Chenab river, located in Kishtwar district of Union Territory of Jammu & Kashmir. The project is envisaged as a storage scheme.
Feature List
Feature Name
Description
Location
Village Drangdhuran in district Kishtwar of Union Territory of Jammu & Kashmir
Approach
Nearest Railhead – Udhampur (220 Km.) Nearest Airport- Jammu (285 Km.)
River
Chenab
Capacity
1000 MW (4X 250 MW)
Design Energy
3230 MU (in a 90% dependable year)
Estimated Project Cost
Rs. 8112.12 crore (March. 2013 Price Level)
Date of Commercial Operation (COD)
SEP 2026 (Anticipated)
TECHNICAL FEATURES Dam 167 m High Concrete Face Rock Fill Dam (CFRD). India’s highest CFRD Diversion Tunnel 859m long, 11m dia. River Diversion successfully completed on 01.11.2021. HRT 2 Nos, 7.2 m dia. Horse Shoe (2.25 km Drill and Blast excavation)/Circular shaped (7.35 km TBM excavation) – Total Length - 9.6 Km each. Surge Shaft 2 nos. 200m deep, 13m dia, vertical Pressure Shaft 4 nos. - 291m deep, 3.9m dia, Vertical Power House Underground (166m ×20.20m × 50.50m); 4 units of 250 MW each (1000 MW) – Francis turbine Location - near village Dul about 26 kms from Kishtwar Rated Head 397m Project Status Under Construction