NIT No.:NH/CPS-1/P&C/W-1567/2025-26/312 Dated: 07/11/2025
Protection work of road between Switchyard and Power House, CPS-1, Khairi.
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 07-11-2025 | 22-11-2025 |
| Bid Opening Date | 25-11-2025 |
| Download Document |
Download PDF
( डाउनलोड | 4.38 MB | PDF | एडोबी रीडर या ब्राउज़र से खोलें) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| NH/CPS-1/P&C/W-1567/2025-26/312 Dated: 07/11/2025 | Protection work of road between Switchyard and Power House, CPS-1, Khairi. | 25-11-2025 | 22-11-2025 |
| Tender Document | Login to Download | ||
AS PER NIT
No corrigendums available for this tender.