NIT No.:NH/CPS-1/P&C/W-1533/2025-26/224 Dated: 19/09/2025
Design, Supply, Installation, testing and commissioning of main cooling water pump Motor set (Split casing pump motor set instead of vertical pump motor set) of Chamera-I Power Station.
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 19-09-2025 | 10-10-2025 |
| Bid Opening Date | 29-10-2025 |
| Download Document |
Download PDF
( डाउनलोड | 5.86 MB | PDF | एडोबी रीडर या ब्राउज़र से खोलें) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| NH/CPS-1/P&C/W-1533/2025-26/224 Dated: 19/09/2025 | Design, Supply, Installation, testing and commissioning of main cooling water pump Motor set (Split casing pump motor set instead of vertical pump motor set) of Chamera-I Power Station. | 29-10-2025 | 10-10-2025 |
| Tender Document | Login to Download | ||
Description:
AS PER NIT
Corrigendum List
| Sr No | Tender ID | Corrigendum | Details | Date | Expiry Date | Document |
|---|---|---|---|---|---|---|
| 1 | 8488 | Corrigendum#1 | TIME EXTENSION OF BID SUBMISSION DATE | 14-10-2025 | 29-10-2025 | Download |