NIT No.:2025_NHPC_849236_1

Selection of BESS Developers for setting up of 500MW / 1000MWh InSTS connected standalone BESS in the state of Andhra Pradesh under TBCB with VGF support (NHPC-Tranche-II-BESS) (2024-25)

Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date: Bid Submission End Date:
01-01-1970 01-01-1970
Bid Opening Date: 01-05-3000
Download Document Download PDF (opens in a new tab, PDF)
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. Title Bid Opening Date End Date
NH/CCW/CC-I/CO-365/PR16924/47 Selection of BESS Developers for setting up of 500MW / 1000MWh InSTS connected standalone BESS in the state of Andhra Pradesh under TBCB with VGF support (NHPC-Tranche-II-BESS) (2024-25) 20-03-2025 17-03-2025
Tender Document Login to Download

Description:

<strong>NOTICE INVITING TENDER</strong><br /> <br /><strong>INTRODUCTION</strong><ol><li>NHPC LIMITED (hereinafter referred to as “NHPC”), has been nominated as a BESS Implementing Agency (BIA) by Ministry of Power, GoI under the Viability Gap Funding (VGF) scheme (CPSU Component) for Development of Battery Energy Storage Systems (BESS).</li></ol>1.1       With various global developments in technology and manufacturing, Renewable Energy (RE) has become the most affordable and cheapest source for meeting energy requirements. In India, the government has set an ambitious target of reaching 500 GW of non-fossil fuel capacity by 2030. However, sources such as solar and wind energy are intermittent and cannot provide a continuous, 24/7 supply like conventional power plants. To address this variability, Energy Storage Systems (ESS) are essential. ESS store excess energy when production exceeds demand and discharge it during peak periods, ensuring a stable power supply. As India increases its reliance on renewable energy, grid stability becomes a challenge, particularly during peak periods when RE generation is insufficient. This requires additional power sources to balance the demand. ESS plays a critical role in managing these fluctuations, supporting grid operators in maintaining reliability and smooth integration of RE into the grid. Additionally, ESS connected to SPV plants can enhance the capacity utilization of RE transmission systems.<br />1.2       The above aspects rightly point out to the next course of direction of India’s energy planning methodology-integrating Energy Storage Systems (ESS) with existing and upcoming RE capacity in order to optimize generation mix while also better utilizing the transmission infrastructure in the country. With respect to increasing the storage component in the energy mix, CEA’s Report on identification of usage of storage as business case and for ancillary services, identifies Pumped Hydro Storage System (PSP) and Battery Energy Storage Systems (BESS) as the commercially deployed solutions for providing requisite storage capacity. The CEA Study has revealed that the planning model selects the battery energy storage system from the year 2027-28 onwards and a Battery Energy Storage capacity of 8680 MW/34720 Mwh (4-hour storage) is projected to be part of the installed capacity in 2022-27. This will be in addition to 7446 MW of Pumped Hydro Storage System envisaged to be a component of India’s installed capacity in 2022-27.<br /> <br />1.3       Going forward, the planning process for transition to a greener energy mix in the country would entail integrating the planned Renewable capacity into India’s energy grid while ensuring its safety and reliability. In addition to Pumped Hydro Storage Plants (PSP), Battery Energy Storage Systems (BESS) are expected to play a crucial role in supporting the grid as the share of renewable energy increases, aligning with the government's target of installing 500 GW of non-fossil fuel-based capacity by 2030. BESS assets will provide the necessary flexibility in power generation, ensuring resource adequacy and helping to balance supply and demand. Besides, Energy Storage Systems have the potential to optimize the utilization of India’s transmission network, reducing congestion and minimizing the need for extensive infrastructure expansion<br /> <br />1.4     Bidder shall submit bids offering contracted Capacity of either one project or multiple projects in any combination out of total capacity of 500MW/1000MWh in the prescribed formats at specified locations. The minimum capacity against which the bids are to be submitted by the bidders in each location shall not be less than the capacity at each location as per Column (3) of table under Clause 3.1 of Section-3A of RfS. However, the total capacity to be allocated to a Bidder including its Parent, Affiliate or Ultimate Parent or any Group Company shall be up to 1000 MWh (i.e.  Total contracted capacity under this RfS), in case a bidder chooses to apply for all the three  project locations.<br />1.5     The bidders will be short-listed by the process of e-bidding (<strong>Single Stage Two Envelope Bidding Process. Envelope-I: Technical Bid and Envelope-II: Financial Bid) </strong>to be followed by reverse auction process for selection of bidders. E-bidding is a new methodology for conducting Public Procurement in a transparent and secured manner. For conducting electronic tendering, NHPC Ltd<em>.</em> is using the Central Public Procurement  (CPP)  Portal <a href="http://eprocure.gov.in/eprocure/app">http://eprocure.gov.in/eprocure/app</a>. The site can also be viewed through e-procurement corner of NHPC website <a href="http://www.nhpcindia.com">www.nhpcindia.com</a> and CPP Portal.<br /><strong>OVERVIEW OF RFS:</strong><br />1.6     Battery Energy Storage System Developers (hereinafter referred to as BESSDs) selected by NHPC based on this RfS, shall set up the BESS on Build Own Operate (BOO) basis in accordance with the provisions of this RfS document and standard BESPA.<br /><strong>SELECTION OF TECHNOLOGY & ELIGIBLE PROJECTS UNDER THIS RFS</strong><br />1.7     Under this RfS, the BESSD shall set up the Project including the dedicated transmission network up to the Interconnection/Delivery Point, at its own cost and in accordance to the provisions of this RfS document. All approvals, permits and clearances required for setting up of the Project and/or dedicated transmission network upto the Delivery Point (along with connectivity), including those required from State Government and local bodies, shall be in the scope of the BESSD. The Projects to be selected under this scheme provide for deployment of Battery Energy Storage Technology. However, the selection of Projects would be technology agnostic within the above segment.<br /> <br />1.8     The Bidders will be free to avail fiscal incentives like Accelerated Depreciation, Concessional Customs and Excise Duties, Tax Holidays etc. available if any for such Projects. The same will not have any bearing on comparison of bids for selection. As equal opportunity is being provided to all Bidders at the time of tendering itself, it is up to the Bidders to avail various tax and other benefits. No claim shall arise on the BIA for any liability if Bidders are not able to avail fiscal incentives and this will not have any bearing on the applicable tariff. The BIA shall not bear responsibility for any availability or non-availability of fiscal incentive and submission of the bid by the Bidder shall be independent of such availability or non-availability as the case may be of the fiscal incentives.<br />         <br />1.9       <strong>Viability Gap Funding (VGF) </strong>Projects selected under this RfS shall be eligible for grant of Central Financial Assistance in the form of Viability Gap Funding (VGF), to be released as per the provisions contained in this RfS.<br /><strong>GUIDELINES FOR IMPLEMETATION OF THE RFS</strong><br />1.10     This RfS document has been prepared based on the Guidelines for “Procurement and Utilization of Battery Energy Storage Systems as part of Generation, Transmission and Distribution assets,<a name="page7"></a> along with Ancillary Services”, issued by Ministry of Power vide Gazette Notification dated 10.03.2022 and subsequent amendments and clarifications issued thereto until the bid submission deadline for this RfS and operational guidelines for CPSU Component under the Scheme for Viability Gap Funding for development of Battery Energy Storage Systems dated 17.10.2024. NHPC has issued this RfS in the capacity of “BESS Implementing Agency” as defined in the aforementioned Guidelines / MOP Letter F.No. 42-26/1/2022-NRE(Pt.II) dated 17.10.2024.<br />1.11     NHPC Limited (hereinafter referred to as the BESS Implementing Agency, or the BIA or NHPC) seeks to utilize energy storage systems, on an “On-Demand” basis, during the peak hours of buying entity i.e. Andhra Pradesh Power Distribution Companies (hereinafter referred to as APDISCOMs / Buying Entity). In view of the above, the BIA hereby invites proposals for setting up of InSTS-connected Projects of Standalone Battery Energy Storage Systems (BESS), for an aggregate storage capacity of 1000 MWh (500 MW x 2 hrs) to meet morning and evening peak requirements with 2 cycle charging/discharging operation (2 hours per cycle) each day of BESS with project to be located in the State of Andhra Pradesh connected with the State Transmission Utility.<br /> <br />            Being lowest bidder does not <a name="_Hlk182667531">entail</a> the bidders to be eligible for issuance of LOAs. LOAs shall be issued for a cumulative capacity of 1000MWh after getting confirmation from APDISCOMs for offtake of power from the BESS at the discovered tariff / fixed cost, arriving a mutual agreement between NHPC and APDISCOMs for setting up of such BESS capacity in the state of Andhra Pradesh and the decision of NHPC in this regard shall be final and binding on the bidders. <br />             <br />            NHPC / BIA shall enter into a Battery Energy Storage Purchase Agreement (BESPA) with the successful Bidders selected based on this RfS, for availing the Energy Storage facility as per the terms, conditions and provisions of the RfS and BESPA. <strong>It is clarified that charging power shall be provided by the Buying entity</strong>.<br />           <br />1.12     Energy Storage facility to be procured by NHPC from the above BESS has been provisioned to be done on behalf of APDISCOMs. NHPC shall be an intermediary nodal agency for using the energy storage facility and charging/discharging the BESS in line with respective agreements with the BESSD and Buying Entity / APDISCOMs, based on due performance by the concerned parties. For this tranche, 100% of the awarded capacity shall be off taken by APDISCOMs / Buying Entity.<br /> <br />            <a name="page8"></a><br /><strong>GENERAL</strong><br />1.13     The complete RfS Documents are available at CPP portal <a href="http://eprocure.gov.in/eprocure/app">http://eprocure.gov.in/eprocure/app</a>. The site can also be viewed through e-procurement corner of NHPC website www.nhpcindia.com and CPP Portal. Interested bidders shall download the RfS Documents from the CPP portal <a href="http://eprocure.gov.in/eprocure/app">http://eprocure.gov.in/eprocure/app</a> as per the provisions available therein.<br />1.14 For proper uploading of the bids on the portal namely <a href="http://eprocure.gov.in/eprocure/app">http://eprocure.gov.in/eprocure/app</a><em> (hereinafter referred to as the ‘portal’)</em>, it shall be the sole responsibility of the bidders to apprise themselves adequately regarding all the relevant procedures and provisions as detailed in the portal. The NHPC in no case shall be responsible for any issues related to timely or properly uploading/ submission of the bid in accordance with the relevant provisions of ITB of the Bidding Documents.<br />1.15     A Single Stage Two Envelope Bidding Procedure will be adopted and will proceed as detailed in the RfS Documents. Bidding will be conducted through the global competitive bidding procedures as per the provisions of ITB and the contract shall be executed as per the provisions of this RfS. It shall be noted that the respective rights of the NHPC and the Bidder/ BESSD shall be governed by the RfS Documents/BESSA signed between the NHPC and the BESSD for the project.<br />1.16   Bidders should submit their bid proposal online complete in all aspect on or before last date and time of Bid Submission as mentioned on CPP portal <a href="https://www.tcil-india-electronictender.com/">(http://eprocure.gov.in/eprocure/app</a>).<br />1.17     Bidder shall submit bid proposal along with Bid Processing Fees (non-­refundable) and Earnest Money Deposit (EMD) complete in all respect as per the Bid Document. Techno-commercial bids will be opened in online presence of authorized representatives of bidders who wish to be present online. Bid proposals received without the prescribed Bid Processing Fees and Earnest Money Deposit (EMD) may be considered as non-responsive. <strong>In the event of any date indicated is a declared Holiday, the next working day shall become operative for the respective purpose mentioned herein.</strong><br />1.18     RfS documents which include Eligibility Criteria, Technical Specifications, various Conditions of Contract, Formats etc. can be downloaded from CPP portal <a href="https://www.tcil-india-electronictender.com/">(http://eprocure.gov.in/eprocure/app</a>). Any amendment(s) / corrigendum(s) / clarification(s) with respect to this RfS shall be uploaded on CPP portal. The Bidder should regularly check for any Amendment(s) / Corrigendum(s) / Clarification(s) on the above mentioned website.<br />1.19     For multiple Projects, separate Performance Bank Guarantees shall be furnished against each Project being executed under this RfS by the BESSD after issuance of Letter of Award (LOA) by NHPC.<br />1.20    The detailed Qualifying Requirements (QR) is given in Section 3A of the RfS.<br />1.21     NHPC shall conduct e-Reverse Auction (e-RA) as per provisions of RfS documents.<br />1.22     NHPC has issued this RfS in the capacity of BESS Implementing Agency (BIA) as defined in the aforementioned Guidelines. NHPC may develop a suitable monitoring mechanism, to analyze the performance of the Project and carry out random checks to verify compliance of quality standards.<br /><strong><em>1.23     NHPC reserves the right to cancel / withdraw this invitation for bids without assigning any reason and shall bear no liability whatsoever consequent upon such a decision.</em></strong><br /> <br /> <br /> 

Corrigendum List

Corrigendum List Table. It contains Sr No, Tender Id, Corrigendum, Corrigendum Details, Corrigendum Date, Expiry Date and Documents
Sr No Tender Id Corrigendum Corrigendum Details Corrigendum Date Expiry Date Documents
1 7841 Corrigendum1.. Corrigendum1 Extensi.. 2025-03-13 2025-03-13.. View
2 7841 Corrigendum2.. Extension of Critica.. 2025-03-26 .. View
3 7841 Corrigendum 3 Techni.. Corrigendum3 Technic.. 2025-04-08 .. View
4 7841 Corrigendum 4 Extens.. Corrigendum4 Extens.. 2025-04-11 .. View