NIT No.:2022_NHPC_764342_1

Erection of 11 KV Standby Feeder from Salamabad to Nowpora through 11 KV HT AB cable of Uri 2 Power Station

Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date Bid Submission End Date
07-08-2023 21-08-2023
Bid Opening Date 21-08-2023
Download Document Download PDF
( डाउनलोड | 1.06 MB | PDF | एडोबी रीडर या ब्राउज़र से खोलें)
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. Title Bid Opening Date End Date
NH/Uri-II/CnP/23-24/79 Erection of 11 KV Standby Feeder from Salamabad to Nowpora through 11 KV HT AB cable of Uri 2 Power Station 21-08-2023 21-08-2023
Erection of 11 KV Standby Feeder from Salamabad to Nowpora through 11 KV HT AB cable of Uri 2 Power Station Login to Download

Description:

As per tender Document.