TEESTA LOW DAM - IV


  

Teesta Low Dam–IV power station (4X40 MW) is a run of the river scheme with diurnal storage for peaking purpose. The Power Station was commissioned in the year 2016. The layout plan features and photo gallery of the Power Station are detailed below.
 
Feature List
Feature Name Description
Location Distt. Darjeeling, West Bengal
Approach Nearest Rail Head - New Jalpaiguri Nearest Airport - Bagdogra
Capacity 160 MW (4x40 MW)
Design Energy 717.717 MU (90% dependable year with 95% machine availability)
Beneficiary States/UTs West Bengal
Date of Commercial Operation (COD) U#1 11/03/2016 U#2 31/03/2016 U#3 17/07/2016 U#4 19/08/2016
Dam: 
TypeConcrete gravity/Roller Compacted concrete Dam.
Height45 m high
FRL:182.25 m
MDDL179 m
Max TWL155.4 m
Penstock 
Length45 m
Diameter7 m
Diversion Channel 
Typetrapezoidal
Length779.5 m long
Tail pool 
Tail Pool Length98 m
Max TWL155.4 m
Power House 
TypeSurface
CapacityComprising of 4 units of 40 MW each
Turbine 
TypeKaplan
Rated head25.05 m
Design discharge699.8 cumecs (For all 4 units)
Number of guide vanes24
Generator 
Rated Continuous output44.5 MVA
Rated Voltage11 KV
No of Poles48
Rated speed125 RPM
Generator Step up Transformer (GSU) 
Type3-Ф
Voltage Ratio11/220kV
Rated MVA:50MVA
Type of coolingOFAF
Switchyard 
TypeAIS
Voltage level220 kV
No. of lines03 Lines
 TLD-IV – New Jalpaiguri (Line I & II)
 TLD-III - TLD-IV (Line III)