NIT No.:2026_NHPC_ 925343_1
Repairing of dam site internal road from dam control room along power channel to NH-1A towards gate no-2 including up to power intake and SFT of Uri-II Power Station, JK
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 09-09-2026 | 29-09-2026 |
| Bid Opening Date | 09-10-2026 |
| Download Document |
Download PDF
( Download | 1.65 MB | PDF | Open with Adobe Reader or browser) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| NH/Uri-II/CnP/26-27/186 | Repairing of dam site internal road from dam control room along power channel to NH-1A towards gate no-2 including up to power intake and SFT of Uri-II Power Station, JK | 09-10-2026 | 29-09-2026 |
| Login to Download | |||
As per attached document
No corrigendums available for this tender.