NIT No.:2026_NHPC_914891_1

Fencing work around the office-cum-residential complex, construction of a gabion structure behind Prefab Block-1, construction of R.R. masonry boundary wall, and plinth protection work around Prefab Block-1 for the Sawalkote Hydroelectric Project

Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date Bid Submission End Date
27-06-2026 18-07-2026
Bid Opening Date 24-07-2026
Download Document Download PDF
( Download | 0.96 MB | PDF | Open with Adobe Reader or browser)
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. Title Bid Opening Date End Date
NH/SHEP/PNC/2026/PR16726/22 Fencing work around the office-cum-residential complex, construction of a gabion structure behind Prefab Block-1, construction of R.R. masonry boundary wall, and plinth protection work around Prefab Block-1 for the Sawalkote Hydroelectric Project 24-07-2026 18-07-2026
No documents available

Description:

Fencing work around the office-cum-residential complex, construction of a gabion structure behind Prefab Block-1, construction of R.R. masonry boundary wall, and plinth protection work around Prefab Block-1 for the Sawalkote Hydroelectric Project, Tanger, District Ramban, Jammu and Kashmir.