NIT No.:NH/DPS/CONT/NIT-252/2025/E156131 dated 18.10.2025
Dewatering of Tail Race Tunnel of Dulhasti Power Station by providing submersible pumps, DG Sets, LT switchgear/distribution board, Change over panel, crane, pipes, Power/control cables, operation/maintenance staff etc for a period of 45 days”
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 18-10-2025 | 03-11-2025 |
| Bid Opening Date | 05-11-2025 |
| Download Document |
Download PDF
( Download | 3.94 MB | PDF | Open with Adobe Reader or browser) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| Not available | Not available | 05-11-2025 | 03-11-2025 |
| No documents available | |||
Description:
As per NIT enclosed
No corrigendums available for this tender.