NIT No.: NH/CCW/CC-III/CO-389/PR10625/25

Uri-I Stage-II (240 MW) Package-I Civil Works

Bid Submission Start Date Bid Submission End Date
03-06-2025 09-06-2025
Bid Opening Date 11-06-2025
Download Document Download PDF
( Download | 814.77 KB | PDF | Open with Adobe Reader or browser)
Work Specification
Works No. Title Bid Opening Date End Date
NH/CCW/CC-III/CO-389/PR10625/25 Uri-I Stage-II (240 MW) Package-I Civil Works 11-06-2025 09-06-2025
Volume-0 Login to Download
Volume-1 Login to Download
Volume-2 Login to Download
Volume-3 Login to Download
Volume-4 Login to Download
Volume-5 Login to Download
Volume-6 Login to Download

Description:

“Lot-I Package: Civil works comprising of Head Race Tunnel including Adits, Surge Shaft including Adits, Pressure Shaft/Penstock including Adits, Underground Power House Cavern, Bus Ducts, Underground Transformer Cavern, Underground Draft Tube Gate Operation Cavern, Mat and Other Adits / Access Tunnels in Power House Area, Cable cum Ventilation Tunnel, Ventilation Shafts, Downstream Surge Galleries, Tail Race Tunnel including Adits and TRT Outlet Structure for the implementation of the 240 MW Uri-I Stage-II H.E Project, located near Boniyar, Uri villages in the Baramulla District of UT of J&K, India”

Corrigendum List

Sr No Tender Id Corrigendum Details Date Expiry Documents
1 8050 Corrigendum-1.. Corrigendum-1.. 2025-06-05 2025-06-25 View
2 8050 Corrigendum-2.. Corrigendum-2.. 2025-06-05 2025-06-25 View