NIT No.:NH/DPS/CONT/NIT-234/2025/E139125 dated 12.03.2025
Modernization of Plumb-Line System by Supply and Installation of Automatic Plumb line System one at EL at 1212 m and two at EL 1250 m (XY Coordinator readout Charge Coupled Device and automatic data transmission to Dam Control Room) at Dul Dam, Dulhasti Kishtwar
Bid Submission Start Date: | Bid Submission End Date: |
---|---|
01-01-1970 | 01-01-1970 |
Bid Opening Date: | 01-01-1970 |
Download Document | Download PDF (opens in a new tab, PDF) |
Works No. | Title | Bid Opening Date | End Date |
---|---|---|---|
NH/DPS/CONT/NIT-234/2025/E139125 dated 12.03.2025 | Modernization of Plumb-Line System by Supply and Installation of Automatic Plumb line System one at EL at 1212 m and two at EL 1250 m (XY Coordinator readout Charge Coupled Device and automatic data transmission to Dam Control Room) at Dul Dam, Dulhasti Kishtwar | 08-04-2025 | 03-04-2025 |
Technical Specification | Login to Download | ||
NHPC Safety manual | Login to Download | ||
BOQ | Login to Download | ||
Complete tender document | Login to Download |
Description:
As per tender document
Corrigendum List
Sr No | Tender Id | Corrigendum | Corrigendum Details | Corrigendum Date | Expiry Date | Documents |
---|---|---|---|---|---|---|
1 | 7918 | Corrigendum for exte.. | Corrigendum for exte.. | 2025-03-22 | .. | View |