NIT No.:NH/CPS-1/P&C/W-1493/2024-25/839 Dated: 03/02/2025
Repair/Restoration work of 2.0 Ton Air Conditioner Units installed in Power House, Ravi Retreat and Gym of CPS-I.
Bid Submission Start Date | Bid Submission End Date |
---|---|
06-02-2025 | 27-02-2025 |
Bid Opening Date | 03-03-2025 |
Download Document |
Download PDF
( Download | 4.08 MB | PDF | Open with Adobe Reader or browser) |
Works No. | Title | Bid Opening Date | End Date |
---|---|---|---|
NH/CPS-1/P&C/W-1493/2024-25/839 Dated: 03/02/2025 | Repair/Restoration work of 2.0 Ton Air Conditioner Units installed in Power House, Ravi Retreat and Gym of CPS-I. | 03-03-2025 | 27-02-2025 |
Tender Document | Login to Download |
Description:
AS PER NIT
Corrigendum List
Sr No | Tender ID | Corrigendum | Details | Date | Expiry Date | Document |
---|---|---|---|---|---|---|
1 | 7807 | Corrigendum#1 | TIME EXTENSION OF BID SUBMISSION DATE | 08-03-2025 | 19-03-2025 | Download |
2 | 7807 | Corrigendum#1 | TIME EXTENSION OF BID SUBMISSION DATE | 08-03-2025 | 19-03-2025 | Download |
3 | 7807 | Corrigendum#1 | TIME EXTENSION OF BID SUBMISSION DATE | 08-03-2025 | 19-03-2025 | Download |