NIT No.: NH/Sewa-II/Contracts/CW-611/2024/NIT-22/258 Dated 19.02.2024
Stabilization of hill slope side of penstock u/s of AB # 8 at Sewa -II Power Station, Mashka, J&K (CW-611)
Bid Submission Start Date | Bid Submission End Date |
---|---|
20-02-2024 | 12-03-2024 |
Bid Opening Date | 16-03-2024 |
Download Document |
Download PDF
( Download | 899.00 KB | PDF | Open with Adobe Reader or browser) |
Works No. | Title | Bid Opening Date | End Date |
---|---|---|---|
2024_NHPC_794182_1 | Stabilization of hill slope side of penstock u/s of AB # 8 at Sewa -II Power Station, Mashka, J&K (CW-611) | 16-03-2024 | 12-03-2024 |
Complete bid documents as attached. | Login to Download | ||
Drawing as attached. | Login to Download | ||
NHPC Safety Manual as attached. | Login to Download | ||
Price Bid (BOQ) in .xls format to be filled and uploaded in attached BOQ template on CPP portal only. | Login to Download |
Description:
As per attached NIT.