NIT No.:2023_NHPC_781604_1
Replacement of Rotating Labyrinths, any repairs required there off and HP-HVOF Coating of Francis Runner of 60 MW Hydro-Generator of Uri-II Power station for FY 2023-24
Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date:
|
Bid Submission End Date:
|
01-01-1970 |
01-01-1970 |
Bid Opening Date:
|
01-01-1970 |
Download Document
|
Download PDF (opens in a new tab, PDF)
|
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. |
Title |
Bid Opening Date |
End Date |
NH/Uri-II/CnP/23-24/94 |
Replacement of Rotating Labyrinths, any repairs required there off and HP-HVOF Coating of Francis Runner of 60 MW Hydro-Generator of Uri-II Power station for FY 2023-24 |
15-12-2023 |
09-12-2023 |
|
Login to Download
|
Description: