NIT No.:2023_NHPC_ 775928 _1

Mud lifting / De-silting from stop log Gate Grooves of RG #1 & RG #2 up to successful placement of Stop log Units in stop log Gate grooves at Dam site, Kharamukh.(Package No. HM-03)”.

Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date Bid Submission End Date
12-10-2023 02-11-2023
Bid Opening Date 04-11-2023
Download Document Download PDF
( Download | 212.62 KB | PDF | Open with Adobe Reader or browser)
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. Title Bid Opening Date End Date
NH/CPS-3/Cont./HM-03/2023-24/210 dated 12/10/2023 “Mud lifting / De-silting from stop log Gate Grooves of RG #1 & RG #2 up to successful placement of Stop log Units in stop log Gate grooves at Dam site, Kharamukh.(Package No. HM-03)”. 04-11-2023 02-11-2023
Login to Download