NIT No.:2023_NHPC_ 775928 _1
Mud lifting / De-silting from stop log Gate Grooves of RG #1 & RG #2 up to successful placement of Stop log Units in stop log Gate grooves at Dam site, Kharamukh.(Package No. HM-03)”.
Bid Submission Start Date: | Bid Submission End Date: |
---|---|
01-01-1970 | 01-01-1970 |
Bid Opening Date: | 01-01-1970 |
Download Document | Download PDF (opens in a new tab, PDF) |
Works No. | Title | Bid Opening Date | End Date |
---|---|---|---|
NH/CPS-3/Cont./HM-03/2023-24/210 dated 12/10/2023 | “Mud lifting / De-silting from stop log Gate Grooves of RG #1 & RG #2 up to successful placement of Stop log Units in stop log Gate grooves at Dam site, Kharamukh.(Package No. HM-03)”. | 04-11-2023 | 02-11-2023 |
Login to Download |
No corrigendums available for this tender.