NIT No.:2022_NHPC_764342_1
Erection of 11 KV Standby Feeder from Salamabad to Nowpora through 11 KV HT AB cable of Uri 2 Power Station
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 07-08-2023 | 21-08-2023 |
| Bid Opening Date | 21-08-2023 |
| Download Document |
Download PDF
( Download | 1.06 MB | PDF | Open with Adobe Reader or browser) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| NH/Uri-II/CnP/23-24/79 | Erection of 11 KV Standby Feeder from Salamabad to Nowpora through 11 KV HT AB cable of Uri 2 Power Station | 21-08-2023 | 21-08-2023 |
| Erection of 11 KV Standby Feeder from Salamabad to Nowpora through 11 KV HT AB cable of Uri 2 Power Station | Login to Download | ||
As per tender Document.
No corrigendums available for this tender.