Under1000 MW CPSUs Scheme Solar Project, Rajasthan 300 MW P S


300 MW Solar Power Project at Bikaner is being set up under Ministry of New and Renewable Energy (Govt. of India) CPSU Scheme, Phase-II, Tranche-III. NHPC is implementing the development of this project through EPC Contract for 300 MW Grid Connected Solar PV Project and transmission line for power evacuation to ISTS sub-station along with comprehensive O&M for 05 years. The power generated from this 300 MW project shall be evacuated through Bikaner-II ISTS Substation for use by Government/Government entities through sale of power to Punjab State Power Corporation Limited (PSPCL). Only domestically manufactured Cells & Modules shall be used for setting up of Solar Plant as per the provision of CPSU Scheme.  
 
Feature List
Feature Name Description
Approach Nearest Railhead: Bikaner (Appx. 60 KM), Nearest Airport: Bikaner (Appx. 70 KM)
Location BIKANER RAJASTHAN
Design Energy 749.09 MUs (CUF: 28.50%)
Date of Commercial Operation (COD) 12/04/2025
Project Cost Rs. 1677.12 Crore
Capacity 107.14 MW
Project Capacity: 300 MW
Connectivity Substation: Bikaner-II Substation
Voltage level of Transmission line: 220 kV
Length of O/H Transmission line: 21 KM
Annual Generation for 1st Year: 749.09 MUs (CUF : 28.50%)
DC:AC Ratio: 1.5
Project Status : Under Construction