UNDER1000 MW CPSUS SCHEME SOLAR PROJECT, RAJASTHAN 300 MW
300 MW Solar Power Project at Bikaner is being set up under Ministry of New and Renewable Energy (Govt. of India) CPSU Scheme, Phase-II, Tranche-III. NHPC is implementing the development of this project through EPC Contract for 300 MW Grid Connected Solar PV Project and transmission line for power evacuation to ISTS sub-station along with comprehensive O&M for 05 years. The power generated from this 300 MW project shall be evacuated through Bikaner-II ISTS Substation for use by Government/Government entities through sale of power to Punjab State Power Corporation Limited (PSPCL). Only domestically manufactured Cells & Modules shall be used for setting up of Solar Plant as per the provision of CPSU Scheme.
Feature Name | Description |
---|---|
Location | Village: Karnisar-Bhatiyan, Teh.: Poogal, District- Bikaner, Rajasthan |
Approach | Nearest Railhead: Bikaner (Appx. 60 KM), Nearest Airport: Bikaner (Appx. 70 KM) |
Capacity | 300 MW (AC) |
Design Energy | 749.09 MUs (CUF: 28.50%) |
Date of Commercial Operation (COD) | March 2025 (Anticipated) |
Project Cost | Rs. 1677.12 Crore |
Project Capacity: 300 MW
Connectivity Substation: Bikaner-II Substation
Voltage level of Transmission line: 220 kV
Length of O/H Transmission line: 21 KM
Annual Generation for 1st Year: 749.09 MUs (CUF : 28.50%)
DC:AC Ratio: 1.5
Project Status : Under Construction
Connectivity Substation: Bikaner-II Substation
Voltage level of Transmission line: 220 kV
Length of O/H Transmission line: 21 KM
Annual Generation for 1st Year: 749.09 MUs (CUF : 28.50%)
DC:AC Ratio: 1.5
Project Status : Under Construction