Kirthai HEP - II - NHPC India
Kirthai HEP - II - NHPC India
Kirthai HEP - II
Kirthai-II HE Project is a run-of- river project located in Kishtwar district, J&K at about 25 Kms upstream of Kiru H.E. Project on river Chenab. The project would provide an annual generation of 3329.52 MU in a 90% dependable year.
Feature List
Feature Name
Description
Approach
Nearest rail head: Udhampur – 180 KM
Nearest Airport : Jammu – 240 KM
Location
District Kisthwar, UT of Jammu & Kashmir
Capacity
930 MW (6X140+2X35+2X10)
Design Energy
3329.52 MUs (in a 90% dependable year)
Date of Commercial Operation (COD)
60 Months
Estimated Project Cost
₹ 6384.39 Crore at February 2020 Price level
River
CHENAB
TECHNICAL FEATURES The structures required to be constructed for Kirthai-II HE Project are: HRT 1 no., 11m diameter, 5.79 km length Dam 131m (H) , Concrete Gravity Surge Shaft 22.5 m dia. & 97.0 m height Pressure Shaft 2 No., 6.6 m 310m length each Power House Underground (6X140+2X35+2X10) Project Status Under Clearance