SAWALKOT HEP



 
Sawalkot HE Project is a run-of-the-river project proposed on the river Chenab in district Ramban & Udhampur of UT Jammu & Kashmir. Sawalkot HE Project will generate annual energy of 7994.73  MUs.
 
Feature List
Feature Name Description
Location District Ramban & Udhampur of UT Jammu & Kashmir
Approach Nearest rail head: Udhampur-90KM Nearest airport :Jammu-150KM
River Chenab
Capacity 1856 MW - (8 x 225 MW + 1 x 56 MW )
Design Energy 7994.73MU (in a 90% dependable year).
Estimated Project Cost 22704.80 Crores (At Completion Level)
Date of Commercial Operation (COD) 96 months from the date of Govt. Sanction.

TECHNICAL FEATURES
  • The structures required to be constructed for Sawalkot  HE Project are:
 
Dam192.5 m (Height)
Diversion Tunnel3 No. 13.50 m X19 m, 965m, 1130m and 1280m long 
HRT3 no. {2 No. 12.8m dia  and 1 No.10.8m dia), each 200m length 
Power HouseUnderground  (8 X225  MW+1 X56 MW)
Rated Head155.7m 
Project StatusUnder  Clearance