RATLE HEP (JV)
Ratle Hydro Electric Project (850 MW) is proposed on River Chenab, located in Kishtwar district of the Jammu & Kashmir. The project is envisaged as a Run of River Scheme
Feature List
Feature Name |
Description |
Location |
District Kisthwar of UT Jammu & Kashmir |
Approach |
Nearest rail head: Udhampur - 140 KM Nearest airport: Jammu - 201 KM |
River |
Chenab |
Capacity |
850 MW - (4 x 205 MW + 1 x 30 MW) |
Design Energy |
3136.76MU (in a 90% dependable year). |
Estimated Project Cost |
₹ 5281.94 Crores (November-2018 Price Level) |
Date of Commercial Operation (COD) |
Dec-27 (Anticipated)
|
TECHNICAL FEATURES | Dam | 133 m high RCC Gravity Dam | Diversion Tunnel | 2Nos. (488m & 560m length) 11.4m dia Modified Horseshoe type | D/s Surge Chamber | Size of cavern(LxWxH): 110m x 12.5m x 32.2m | Pressure Shaft | Pressure shaft (4Nos. dia. 7m) | Power House | Underground, Size (LxWxH): 221.85m x 23.9m x 59.1m; Type of turbine: Francis | TRT | 4Nos.TRTs with dia 8.7m & 1No. | Rated Head | 97m | River Diversion | 27.01.2024 | Project Status | Under Construction | | |
|