Uri-II

Uri-II power station is run-of-the-river scheme with an installed capacity of 240 MW (4 X 60 MW) to harnesses the Hydropower potential of river Jhelum (a tributary of Indus river). The Power Station was commissioned in year the 2013-14.The layout plan features and photo gallery of the Power Station are detailed below.
| Feature Name | Description |
|---|---|
| Approach | Nearest Airport: Srinagar, Nearest Rail Head: Udhampur/Jammu |
| Location | Baramulla District, Union Territory of J&K |
| Capacity | 240 MW |
| Design Energy | 1123.77 (90 % dependable year with 95% machine availability) |
| Beneficiary States/UTs | Jammu & Kashmir, Punjab, Delhi, Himachal Pradesh, Haryana, Rajasthan, Uttar Pradesh, Uttarakhand & Chandigarh |
| Date of Commercial Operation (COD) | U#1- 11/10/2013 U#2 - 01/12/2013 U#3 - 11/10/2013 U#4 - 01/03/2014 |
| Dam | |
| Type | Concrete gravity Dam: |
| Height | 52 m |
| Length | 157 m |
| FRL: | 1241 m |
| MDDL | 1241 m |
| HRT: | |
| Type | Horse-shoe shaped. |
| Diameter | 8.4 m |
| Length | 4.28 Km |
| Pressure Shaft | |
| No’s of Pressure shaft | 2 no. |
| Type | Circular steel lined |
| Diameter | 5 m internal dia (from surge shaft to branching) |
| TRT/Tail pool | |
| Type | Horse-shoe shaped. |
| Diameter | 8.4 m |
| Length | 3.637 Km |
| TWL | 1111 m |
| Power House | |
| Type | Under Ground |
| Capacity | Comprising of four units of 60 MW each. |
| Turbine | |
| Type | Francis |
| Rated head | 118 m |
| Design discharge | 225 m3/sec (for all 04 units) |
| Number of guide vanes | 20 |
| Generator | |
| Rated Continuous output | 67 MVA |
| Rated Voltage | 11 kV |
| No of Poles | 20 |
| Rated speed | 300 RPM |
| Generator Step up Transformer (GSU) | |
| Type | Indoor; Single-Phase |
| Voltage Ratio | 11/400/√3 kV |
| Rated MVA | 25 MVA |
| Type of cooling | OFWF |
| Switchyard/Pot head yard | |
| Type | GIS |
| Voltage level | 400 kV |
| No. of lines | 02 |
| URI-II -Wagoora URI-II-URI-I | |