PARBATI - II

Parbati Hydroelectric Project (Stage-II) is a run-of-the-river scheme proposed to harness hydro potential of the lower reaches of the river Parbati. The river is proposed to be diverted with a Concrete Gravity Dam at Village Pulga in Parbati valley through 31.52 Km long Head Race Tunnel and the Power House shall be located at village Suind in Sainj valley. Thus gross head of 863 m between Pulga and Suind will be utilized for generating 800MW power. The diverted discharge of the river Parbati has been further augmented by diverting the discharge of various nallahs falling along the HRT alignment.
Feature Name | Description |
---|---|
Location | Distt. Kullu, Himachal Pradesh. |
Approach | Nearest Rail Head - Kiratpur & Nearest Airport - Bhunter (Kullu) |
Capacity | 4 x 200 MW |
Design Energy | 3124.6 MU (90% dependable year) |
Beneficiary States/UTs | H.P., Delhi, J&K, Punjab, Haryana, Rajasthan, U.P & Union Territory of Chandigarh. |
Date of Commercial Operation (COD) | March'2025 (Now Anticipated) |
Project Cost | Rs. 3919.59 Crores (December 2001 price level) |
- 83.7 m high concrete Gravity dam.
- 130 m high, 17m Dia Orifice type surge shaft.
- 6 m dia 31.52 km long Head race tunnel.
- 2 Pressure shafts each of 3.5 m dia. and 2121.5 m (right) & 2149.5 m(left) length.
- 4 nos. Tail Race Channels 60m long 5 m x 4.5 m each.
- Surface power house containing 4 Pelton Turbine Generating units of 200 MW each.
- 400 KV GIS Surface Switchyard with 2 outgoing 400 KV feeders.