CHAMERA - I

Feature Name | Description |
---|---|
Location | Distt. Chamba (Himachal Pradesh) |
Approach | Nearest railhead - Pathankot (100 Km) Nearest Airport - Jammu (200 Km) |
Capacity | 540 MW (3 x 180 MW) |
Design Energy | 1664.56 MU (90% dependable year) |
Beneficiary States/UTs | Uttarakhand, UP, Delhi, HP, Haryana, J&K, Punjab, Rajasthan and Chandigarh |
Date of Commercial Operation (COD) | Unit # 1 – 01/05/1994 Unit # 2 – 01/05/1994 Unit # 3 – 01/05/1994 |
Dam | |
Type Height Length | Concrete arch gravity dam 140 m (Above deepest foundation) 295 m |
HRT | |
Type | Horse shoe |
Diameter | 9.5 m |
Length | 6.414 Km |
TRT | |
Type | Horse- shoe |
Diameter | 9.5 m |
Length | 2.447 Km |
Power House | |
Type | Underground |
Capacity | 540 MW (consisting 3 units of 180 MW each) |
Turbine: | |
Type | Francis |
Speed | 214.3 RPM |
Discharge/unit | 117 m3/sec |
No of Guide Vane | 24 |
Rated Head | 185 m |
Generator | |
Rated continuous output | 200 MVA |
Rated Voltage | 13.8 kV |
No of Poles | 28 |
Generator Step up Transformer: (GSU) | |
Type | Single Phase |
Voltage Ratio | 13.8/400/√(3 ) kV |
MVA Rating | 75 MVA |
Type of cooling | OFWF |
Switchyard | |
Type | GIS(Gas Insulated Switchgear) |
GIS(Gas Insulated Switchgear) | 400 kV |
No of lines | 03 lines L1- (Chamera- I – Jalandhar) L2- (Chamera- I – Jalandhar) L3- (Chamera- I - Chamera-II) |