URI-I HEP (STAGE-II)


 
URI  I STAGE II
The Uri-I Stage-II Hydroelectric Project is proposed on the Jhelum River in Baramulla District, UT of J & K. The Uri-I Stage-II Project will generate an annual energy output of 932.60 MUs through an underground powerhouse (2x120 MW). The existing barrage of the Uri-I Power Station will also cater to the requirements of Uri-I Stage-II
 
Feature List
Feature Name Description
Location District Baramulla, UT Jammu and Kashmir
Approach Nearest rail head: Udhampur - 335KM Nearest Airport : Srinagar - 90KM
Capacity 240 MW (2 x 120 MW)
Design Energy 932.60 MUs (in a 90% dependable year)
Date of Commercial Operation (COD) 44 months from the date of Award of works.
Estimated Project Cost ₹ 2526.79 Crores at Completion Level
River Jhelum

TECHNICAL FEATURES
 
  • The existing structures, such as the Barrage, Head Regulator, and Desilting arrangements of the Uri-I Power Station, will be common for both Uri-I PS and the Uri-I Stage-II HE Project.
  • The structures required to be constructed for the Uri-I Stage-II HE Project are :
 
HRT1 No. , 6.5m dia , 10472m length
Surge Shaft1 No. 17 m Dia, 93.5 m height
Pressure Shaft1 No. Steel Lined, 5m Dia  Circular
Power HouseUnderground, Size : 91m(L) X20m(W) X42.8m(H)
TRT1 No. Horse Shoe Shaped, 6.5 m dia
Rated  Head227m
Project StatusUnder Tendering