Uri-I HEP (Stage-II)
The Uri-I Stage-II Hydroelectric Project is proposed on the Jhelum River in Baramulla District, UT of J & K. The Uri-I Stage-II Project will generate an annual energy output of 932.60 MUs through an underground powerhouse (2x120 MW). The existing barrage of the Uri-I Power Station will also cater to the requirements of Uri-I Stage-II
| Feature Name | Description |
|---|---|
| Location | District Baramulla, UT Jammu and Kashmir |
| Approach | Nearest rail head: Udhampur - 335KM Nearest Airport : Srinagar - 90KM |
| Capacity | 240 MW (2 x 120 MW) |
| Design Energy | 932.60 MUs (in a 90% dependable year) |
| Date of Commercial Operation (COD) | 44 months from the date of Award of works. |
| Estimated Project Cost | ₹ 2526.79 Crores at Completion Level |
| River | Jhelum |
TECHNICAL FEATURES
- The existing structures, such as the Barrage, Head Regulator, and Desilting arrangements of the Uri-I Power Station, will be common for both Uri-I PS and the Uri-I Stage-II HE Project.
- The structures required to be constructed for the Uri-I Stage-II HE Project are :
| HRT | 1 No. , 6.5m dia , 10472m length |
| Surge Shaft | 1 No. 17 m Dia, 93.5 m height |
| Pressure Shaft | 1 No. Steel Lined, 5m Dia Circular |
| Power House | Underground, Size : 91m(L) X20m(W) X42.8m(H) |
| TRT | 1 No. Horse Shoe Shaped, 6.5 m dia |
| Rated Head | 227m |
| Project Status | Under Tendering |