Subansiri (Lower)


Subansiri Lower HE Project is a Run of River scheme with small Pondage on river Subansiri. The Project is located near North Lakhimpur on the border of Arunachal Pradesh and Assam. The nearest railhead is Gogamukh/North Lakhimpur and nearest airport is Lilabari / Dibrugarh. The estimated annual energy generation from the Project is 7421.59 MU in a 90% dependable year and 95% Machine Availability. The layout plan, features and photo gallery of the Power Station are detailed below.
 
Feature List
Feature Name Description
Approach Nearest Rail Head is Gogamukh/North Lakhimpur & Nearest Airport is Lilabari / Dibrugarh
Location Located in Lower Subansiri in Arunachal Pradesh and Assam
Capacity 1000 MW (4x250 MW) (Out of 2000 MW)
Design Energy 7421.59 MU (Full Capacity)
Beneficiary States/UTs Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Tripura, Goa, Haryana, U.P, Chhattisgarh, Gujarat, Maharashtra, M.P, Rajasthan, Chandigarh, Delhi
Date of Commercial Operation (COD) Unit # 1: 20/03/2026 Unit # 2 : 23/12/2025 Unit # 3 : 01/02/2026 Unit # 4 : 08/05/2026
Dam 
TypeConcrete Gravity Dam
Height116m
FRL
MDDL
EL 205.00 m
EL 181.0 m
HRT 
Number8
ShapeHorse Shoe, 9.5 m Dia
LengthFrom 608 to 1168 m
Design discharge322.4 cumec
PRESSURE SHAFT 
Number8
ShapeCircular
Diameter8 m
TAIL WATER LEVEL 
Maximum tail water level

 
El 112.0 M
Normal tail water levelEl 108.96 M
Minimum tail water levelEl 105.0 M
Power House 
TypeSURFACE
CapacityComprising of 8 units of 250 MW each
Turbine 
TypeFrancis
Rated Head86 m
Design Discharge322.4 m3/s
No. of GV24
Generator 
Rated continuous output306  MVA
Rated Voltage16±10%kV
No of Poles48
Rated Speed125 rpm
Generator Step up Transformer: (GSU) 
Type1-Ф
Voltage Ratio16 / 400 /√(3 ) kV
MVA Rating102 MVA
Type of coolingOFWF
Switchyard /Potyard 
Switchyard /PotyardGIS (Gas Insulated Switchgear)
Voltage level420 kV 
No. of lines04 Nos (420 kV)
 400KV BISHWANATH CHARIYALI