Consultancy Projects

Completed Consultancy Projects
SL. No.DescriptionClientPeriod
FromTill
1Consultancy services for Inspection of Dhanikhari Dam related to leakage from Gates and Seepage in Gallery.APWD20222023
2Consultancy services for integrity of Diaphragm wall at Polavaram Multipurpose Project.WRD, Govt. of Andhra Pradesh20222023
3Consultancy Services for Preparation of PFR for Panchet Hill PSP site in Purulia district, West BengalDVC20222023
4Setting Up of Advance Industrial Training Demonstration Centre (Aitdc) At NPTI (NR), Badarpur, New Delhi On Deposit Work BasisNPTI20222023
5Consultancy Services for Hydro Asset Valuation, Cost-benefit and Techno Commercial feasibility analysis of 08 Mini-Micro Hydro Projects handed over to Govt. of Jharkhand by Govt. of Bihar.JREDA20212023
6Consultancy Services as Owner’s Engineer of KSEB for Revival of Unit#4 Hydro Turbine Generator of Sabarigiri HEPKSEB20212022
7Preparation of Evaluation Report for PSP sites located at Boro Nala, Jharkhand and Punchet Hills, West BengalDVC20222022
8Preparation of Detailed Project Report (DPR) for Diversion of Seri Nallah away from Atal Tunnel, Rohtang (Himachal Pradesh)BRO20212021
9Consultancy Services for the improvements in maintenance practices and safe operation of units, detailed scope of work and action plan for identified 3No. Hydro Power StationAPGENCO20202021
10Overhauling & Repair of 5.25 MW Kalpong HE Project, A&NED, A&N20182020
11Consultancy services to THDC for conducting control point re-validation Survey of Tehri and Koteshwar Hydroelectric Projects.THDC India20202020
12Design and engineering Services for implementation of Mangdechhu HE Project to MHPA, BhutanMHPA, Bhutan20112020
13Consultancy services for implementation of working mechanism for effective monitoring through Primavera Software (P-6).THDC India20192019
14Feasibility Study for Panchvati, Korang & Rangat Mini / Micro Hydroelectric Projects.A&N Administration20182018
15Health Safety Inspection of Bakreshwrar DamWBCDL20182018
16Consultancy services for assessing feasibility of TSP studies of TBM adit for Vishnugad Pipalkoti Hydro Power Project, THDC in Uttarakhand.THDC India20182019
17Consultancy for rectification work for Control of Leakage from Kadamtala Dam – Andaman & Nicobar Islands.A&N PWD20182020
18Preparation of Tender Document (on EPC basis) on ICB mode for Ken-Betwa Link Canal Project – Phase INWDA20172019
19Updation of DPR of 7.5 MW Thoubal HE Project, ManipurLDHCL20172019
20Technical consultancy services for Pallivasal extension schemeKSEB20142019
21Project Management Consultancy Services during construction of balance works of 1200 MW Teesta III H.E.P.Teesta Urja Limited, A Govt of Sikkim Enterprises20162018
22Emergency Repair of Expansion Joint of Penstock of Kalpong Power StationElectricity Department,20142015
23Inspection of Bakreshwar Dam in Dist. Birbhum, West BengalWBPDC Ltd.20142015
24Management Consultancy Contract in Ethiopia (As a consortium between POWERGRID, NHPC & BRPL with POWERGRID as a leader)EEPCO20132015
25Emergency repair and overhauling of Kalpong Power StationElectricity Department,20132019
26Technical Due Diligence Study of Shiroro Hydro Power Plant (600 MW) in NIGERIA.M/s Dangote Industries Ltd.20122012
27Inspection of Kalpong HEP by NHPCElectricity Dept. (A&N Admn.)20112011
28Construction of 220 KV Additional Bay at Chamera-III HE project for M/s Lanco Budhil Hydro Power Private LimitedM/s Lanco Budhil Hydro Power Private Limited20102011
29Additional Investigations and Preparation of Updated Detailed Project Reports for 1200 MW Tamanthi HEP in MyanmarMEA20102012
30Additional Investigations and Preparation of Updated Detailed Project Reports for 642 MW Shwezaye HEP in MyanmarMEA20102012
31Pre-Construction of Mangedechhu HE ProjectRGoB20102012
32Deputation of NHPC’s expert to Panchet Hydel Power Station for providing assistance to check the problem related to Governing System of Unit#1 of PHPSDVC20092009
33Preparation of Detailed Project Report(DPR) of Chamkarchhu-I hydropower project in BhutanMEA20092012
34Preparation of PFR for Kuri-Gongri HEPRGoB20092011
35Preparation of Detailed Project Report(DPR) of Kuri Gongri hydropower project in BhutanMEA20092012
36Raising the Height of Dhanikhari Dam located in Port Blair, South Andaman on “Deposit Work” basisA&N Administration20092013
37Suggestions / comments regarding Taking Over Certificate for the generating units and clarity on scope of work with regard to conducting actual line charging in 4 x 225 MW Purulia Pumped Storage Project LOT 6.1MITSUI & CO. LTD.20082008
38Renovation, Modernization & Uprating of Varzob - I Hydropower Plant (2x3.67 MW), Tajikistan (jointly in association with M/s BHEL)MEA20082012
39Erection testing and commissioning of 400 kv additional GIS bay and associated equipments at Chamera-II on deposit work basis.POWERGRID20082011
40Supply, Execution, Testing & Commissioning of 400 KV additional GIS bay & associated equipments at Uri-I on Deposit Work Basis.POWERGRID20082011
41Consultancy for Rural Electrification works in Six Districts of Orissa on deposit work basisRE Projects20072012
42Review & Checking of Ash Pond design report as prepared by M/s DCPL -Kolkata, for Bokaro Thermal Power Station, JharkhandDVC20072008
43Review & updation of DPR of Durgaduani Tidal Power Project in Sunderbans, West Bengal.WBREDA20072008
44Consultancy Services for Development of Infrastructures for A&N Police at Port BlairA&N Administration20072011
45Assistance in preparation of DPR for Demwe Hydroelectric Project (3000MW) in Arunachal Pradesh.ADPPL20072010
46Execution of Durgaduani Tidal Power Project (3.65 MW) in Sunderbans, West BengalWBREDA20072012
47Consultancy for Rural Electrification works in Seven Districts of UT of Jammu & Kashmir deposit work basisRE Projects20062011
48Stability of Ash Pond Dyke No. 1 at Bandel Thermal Power StationWBPDC Ltd.20062007
49Repair & Maintenance works for civil structures of Kalpong HE Project on “Deposit Work” basisA&N Administration20062006
50Lender Engineer for annual operation review for Baspa – II HE Project (300 MW)JHPL20062007
51Assistance during commissioning of Maneri Bhali – 2 HE Project.UJVN Ltd.20062006
52Detailed study for Augmentation of Water Supply in North AndamanA&N Administration20062009
53Consultancy Services to examine stability of Bakreshwar Dam before monsoon for a period of 3 years.WBPDCL20062010
54Review, Detailed Design & Engineering & Technical Advisory Services for Tendering and Construction of underground works for Udhampur-Srinagar-Baramulla Rail Link (USBRL) Project in UT of Jammu & KashmirKRCL20062012
55Feasibility Study, Design & Engineering and undertaking the Augmentation of Water Supply to Little Andaman (Hut Bay) area on “Deposit Work” Basis.A&N Administration20062011
56Preparation of DPR of Mangdechhu Hydro Electric Project in the Mangdechhu Basin , BhutanRGoB20062010
57Contour Survey of Plot at Doodhline, Port BlairA&N Administration20052005
58Development of Corporate Organization Structure and Assessment of manpower needs for O&M of 1020 MW Tala Dam and Power Station, BhutanTHPA20052005
59Feasibility Studies for Krishna, Vasundhra & Kamsat Nallah Mini/Micro HE Project.A&N Administration20052007
60Development of Web Site on internet and Intranet Site for Tehri Hydro Development Corporation Ltd.THDC20052007
61Detailed review and updation of DPR of Shahpurkandi HE Project (168 MW), PunjabGoP20052011
62Bihar Rural Road Project in six districts on deposit work basisRDD, Bihar20052012
63Turnkey execution for Electrification works on deposit work basis for Rural Electrification works in seven districts of ChattisgarhRE Projects20052010
64Consultancy for Rural Electrification works in seven districts of Bihar on deposit work basisRE Projects20052010
65Consultancy for Rural Electrification works in Purulia District of West Bengal on deposit work basisRE Projects20052010
66Consultancy Services for Development of proposed campus and complex for India Reserve Battalion at Port Mount, Port Blair on "Deposit Work" basis.A&N Administration20042012
67Preparation of Detailed Project Report of Kalpong D/S HEP in A&N IslandsA&N Administration20032004
68EIA & EMP studies for Dhanikhari Water Supply Scheme, Port BlairA&N Administration20032004
69Preparation of PFRs for Development of Telharkund, Sinafdar, Panchgotia and Hathiadah – Durgawati, Fall sites as Pumped Storage Schemes in Kaimur District, BiharBHPC20032004
70Preparation of PFRs of 43 Hydroelectric Projects in Siang, Dibang, Subansiri, Indus, Narmada & Teesta BasinsCEA20032004
71Works concerning dykes of all existing Ash Ponds at Kolaghat Thermal Power Station, Dist. East Midnapore, West BengalWBPDCL20032004
72Consultancy for works on existing Ash Pond and Dam at Bakreshwar Thermal Power Station, Dist. Birbhum.WBPDCL20032006
73Preparation of PFR for Tamanthi HE Project in MyanmarMEA20032005
74Erection, Testing & Commissioning of two 25 MVAR Shunt Reactors and associated equipment on "Deposit Work" Basis in Pot Head Yard of Dhauliganga HE ProjectPOWERGRID20032006
75Survey of two Plots in Andaman Islands.A&N Administration20032004
76Preparation of Pre-Feasibility Report of Konar Dam in JharkhandDVC20032005
77Design & Drawings for Vehicular Access at Nathpa & Wadhal Adits of Head Race Tunnel for NJPC ProjectSJVN20022002
78Survey & Investigation for setting up large Hydel Projects in Kaimur and Munger Distt., Bihar – Reconnaissance Survey (Phase – I)BHPC20022003
79Preparation of scope of work of HM Equipment of Gangrel HE ProjectCSEB20022003
80Inspection of major E&M equipment of Gangrel Power House (4x2.5 MW) of Mahanadi Reservoir Project in ChattisgarhCSEB20022005
81Preparation of Detailed Project Reports for ten Hydroelectric Projects in the Madei River Basin in North GoaWRD, Govt. of Goa20022006
82Detailed study of heightening of existing Dhanikhari Concrete DamA&N Administration20022003
83Association in Preparing & Filing of Petitions with SERC / CERC for determination of tariff for energy generated from any one hydroelectric project of UJVNL (capacity larger than 25 MW).UJVNL20022004
84Turnkey Execution of Power House of Gangrel Power House (4x2.5 MW) of Mahanadi Reservoir ProjectCSEB20022005
85Phase – I Refurbishment of Hydel Unit No. 1 (1 x 40 MW) and other auxiliary systems of Panchet Hydel Power StationDVC20022008
86Assistance in Operation & Maintenance of Kalpong HE Project (June 02 to May 08).A&N Administration20022008
87Consultancy Service for implementation of Indirasagar & Omkareshwar HE ProjectsNHDC20012009
88Development of EDP & Communication Infrastrstructure for NJHEPSJVN20012005
89Techno-Economic Feasibility Study of Earthen Dam to be constructed downstream of the existing concrete Dhanikhari DamA&N Administration20012001
90Operation & Maintenance of Gyelpozhing-Gelephu Single Circuit 132 KV Transmission Line in BhutanKPA20012002
91Feasibility Study of Kalpong Downstream HE Project in North Andaman IslandA&N Administration20012002
92Commercial Management for Nathpa Jhakri Hydroelectric Power Project (6 x 250 MW)SJVN20012004
93Contracts Management for E&M Works of NJHEPSJVN20012004
94Design & Engg. of E&M Works of NJHEPSJVN20012004
95Operation & Maintenance Management of NJHEPSJVN20012004
96Generating Equipment Review & Erection Review of NJHEPSJVN20012004
97Revamping and Uprating of one Unit & Refurbishment / repairing of cranes of Maithon HE ProjectDVC20002000
98Preparation of Pre-feasibility Report for Tizu-Zungki HE Project (150 MW)PD, GoN20002000
99Construction of Nganglam-Tintibi-Gelephu Single Circuit 132 KV Transmission Line on Turnkey BasisKPA20002002
100Development of Software Packages in F&A AreasBBMB20002005
101Evaluation of existing hydro power plants of Andhra Pradesh Generating companySargent & Lundy, USA19991999
102Repair and Restoration of Spituk Monastery, LehLAHDC19992000
103Lenders Independent Engineer for Baspa - II HE Project (300MW)ICICI19992002
104E&M works for Lhunthsi Mini Hydel projectCWC19981999
105Hydraulic Transient StudiesTPA19981999
106Dynamic Analysis of Water Conductor SystemNJPC/SJVN19981999
107Annual Maintenance for Software packages in F&A AreasNJPC/SJVN19981999
108Evaluation of offers for R&M ProjectsKSEB19971997
109Geo-physical InvestigationsJ&KPDC19971997
110Hydrological Studies - Flood StudiesTHDC19971998
111Design and Investigation of Udhampur Katra Section TunnelsNR19971999
112Construction Management, Quality Control & other services for Bakreshwar Thermal Power Project.WBPDCL19972001
113Flood Studies for Kahalgaon Super Thermal Power ProjectNTPC19961997
114Refraction Seismic ProfilingCES19951996
115Development of IT SystemsNJPC/SJVN19941997
116FEM Analysis of Project StructureNJPC/SJVN19941998
 
Ongoing Consultancy Projects
 
Sr. No.DescriptionClient
1Engineering Services for implementation of 1000 MW Pakaldul HE Project, J&KCVPPPL
2Engineering Services for implementation of 624 MW Kiru HEP, J&KCVPPPL
3Engineering Services for implementation of 540 MW Kwar HEP, J&KCVPPPL
4Technical Support Services to CVPPPL for implementation of 930 MW Kirthai II HEP, UT of J&KCVPPPL
5Providing Project Management Consultancy Services to LTHPL for construction of Teesta VI HEP.LTHPL
6Engineering Services for implementation of 66 MW Loktak D/S HEP, ManipurLDHCL
7a) Engineering Services for 1000 MW Indirasagar and 520 MW Omkareshwar HE Projects (Need basis)
b) Preparation of PFR for proposed PSP scheme near Indirasagar PS in M.P. (Need basis)
NHDC
8Operation & Maintenance of 400 KV GIS Bay of Chamera-II PS, HP.PGCIL
9Construction of Caverns and Bunkers for Indian ArmyIndian Army
10O&M of 100 MVA Transformer installed at Tanakpur PS for trans mission of power to Nepal.NEA , Nepal
11Execution of the work of Diversion of Sri Nala away from Atal Tunnel, Rohtang (H.P) on Deposit Work Basis.BRO
12Consultancy Services to JPCL for implementation of Rangit IV HEPJPCL
13Consultancy Services to RHPCL for implementation of Ratle HEP in UT of J&KRHPCL
14Consultancy Services to NTPC Limited for carrying out the Geophysical Investigation at Koldam HEPs, Bilaspur, Himachal PradeshNTPC
15Consultancy Services for Technical solution for arresting Leakage from  Dhandraul Dam, Mirzapur, UPEE, Mirzapur, IWRD, U.P
16Consultancy Services for Technical solution for arresting Leakage from  Lower Khajuri Weir, Mirzapur, UPEE, Mirzapur, IWRD, U.P
17Consultancy Services for offering comments on the option advised by KSEB for commissioning of Bhothathankettu HE Project.KSEB
18Consultancy Services for vetting of Design of Mankulam and Upper Sengulam HEP.KSEB