Completed Consultancy Projects
Completed Consultancy Projects
| Description | Period | |||
| Till | ||||
| Preparation of Evaluation Report for PSP sites located at Boro Nala, Jharkhand and Punchet Hills, West Bengal | 2022 | 2 | BRO | 2021 |
| Consultancy Services for the improvements in maintenance practices and safe operation of units, detailed scope of work and action plan for identified 3No. Hydro Power Station | 2020 | 4 | ED, A&N | 2020 |
| Consultancy services to THDC for conducting control point re-validation Survey of Tehri and Koteshwar Hydroelectric Projects. | 2020 | 6 | MHPA, Bhutan | 2020 |
| Consultancy services for implementation of working mechanism for effective monitoring through Primavera Software (P-6). | 2019 | 8 | A&N Administration | 2018 |
| Health Safety Inspection of Bakreshwrar Dam | 2018 | 10 | THDC India | 2019 |
| Consultancy for rectification work for Control of Leakage from Kadamtala Dam – Andaman & Nicobar Islands. | 2018 | 12 | NWDA | 2019 |
| Updation of DPR of 7.5 MW Thoubal HE Project, Manipur | 2017 | 14 | KSEB | 2019 |
| Project Management Consultancy Services during construction of balance works of 1200 MW Teesta III H.E.P. | 2016 | 16 | Electricity Department, | 2015 |
| Inspection of Bakreshwar Dam in Dist. Birbhum, West Bengal | 2014 | 18 | EEPCO | 2015 |
| Emergency repair and overhauling of Kalpong Power Station | 2013 | 20 | M/s Dangote Industries Ltd. | 2012 |
| Inspection of Kalpong HEP by NHPC | 2011 | 22 | M/s Lanco Budhil Hydro Power Private Limited | 2011 |
| Additional Investigations and Preparation of Updated Detailed Project Reports for 1200 MW Tamanthi HEP in Myanmar | 2010 | 24 | MEA | 2012 |
| Pre-Construction of Mangedechhu HE Project | 2010 | 26 | DVC | 2009 |
| Preparation of Detailed Project Report(DPR) of Chamkarchhu-I hydropower project in Bhutan | 2009 | 28 | RGoB | 2011 |
| Preparation of Detailed Project Report(DPR) of Kuri Gongri hydropower project in Bhutan | 2009 | 30 | A&N Administration | 2013 |
| Suggestions / comments regarding Taking Over Certificate for the generating units and clarity on scope of work with regard to conducting actual line charging in 4 x 225 MW Purulia Pumped Storage Project LOT 6.1 | 2008 | 32 | MEA | 2012 |
| Erection testing and commissioning of 400 kv additional GIS bay and associated equipments at Chamera-II on deposit work basis. | 2008 | 34 | POWERGRID | 2011 |
| Consultancy for Rural Electrification works in Six Districts of Orissa on deposit work basis | 2007 | 36 | DVC | 2008 |
| Review & updation of DPR of Durgaduani Tidal Power Project in Sunderbans, West Bengal. | 2007 | 38 | A&N Administration | 2011 |
| Assistance in preparation of DPR for Demwe Hydroelectric Project (3000MW) in Arunachal Pradesh. | 2007 | 40 | WBREDA | 2012 |
| Consultancy for Rural Electrification works in Seven Districts of UT of Jammu & Kashmir deposit work basis | 2006 | 42 | WBPDC Ltd. | 2007 |
| Repair & Maintenance works for civil structures of Kalpong HE Project on “Deposit Work” basis | 2006 | 44 | JHPL | 2007 |
| Assistance during commissioning of Maneri Bhali – 2 HE Project. | 2006 | 46 | A&N Administration | 2009 |
| Consultancy Services to examine stability of Bakreshwar Dam before monsoon for a period of 3 years. | 2006 | 48 | KRCL | 2012 |
| Feasibility Study, Design & Engineering and undertaking the Augmentation of Water Supply to Little Andaman (Hut Bay) area on “Deposit Work” Basis. | 2006 | 50 | RGoB | 2010 |
| Contour Survey of Plot at Doodhline, Port Blair | 2005 | 52 | THPA | 2005 |
| Feasibility Studies for Krishna, Vasundhra & Kamsat Nallah Mini/Micro HE Project. | 2005 | 54 | THDC | 2007 |
| Detailed review and updation of DPR of Shahpurkandi HE Project (168 MW), Punjab | 2005 | 56 | RDD, Bihar | 2012 |
| Turnkey execution for Electrification works on deposit work basis for Rural Electrification works in seven districts of Chattisgarh | 2005 | 58 | RE Projects | 2010 |
| Consultancy for Rural Electrification works in Purulia District of West Bengal on deposit work basis | 2005 | 60 | A&N Administration | 2012 |
| Preparation of Detailed Project Report of Kalpong D/S HEP in A&N Islands | 2003 | 62 | A&N Administration | 2004 |
| Preparation of PFRs for Development of Telharkund, Sinafdar, Panchgotia and Hathiadah – Durgawati, Fall sites as Pumped Storage Schemes in Kaimur District, Bihar | 2003 | 64 | CEA | 2004 |
| Works concerning dykes of all existing Ash Ponds at Kolaghat Thermal Power Station, Dist. East Midnapore, West Bengal | 2003 | 66 | WBPDCL | 2006 |
| Preparation of PFR for Tamanthi HE Project in Myanmar | 2003 | 68 | POWERGRID | 2006 |
| Survey of two Plots in Andaman Islands. | 2003 | 70 | DVC | 2005 |
| Design & Drawings for Vehicular Access at Nathpa & Wadhal Adits of Head Race Tunnel for NJPC Project | 2002 | 72 | BHPC | 2003 |
| Preparation of scope of work of HM Equipment of Gangrel HE Project | 2002 | 74 | CSEB | 2005 |
| Preparation of Detailed Project Reports for ten Hydroelectric Projects in the Madei River Basin in North Goa | 2002 | 76 | A&N Administration | 2003 |
| Association in Preparing & Filing of Petitions with SERC / CERC for determination of tariff for energy generated from any one hydroelectric project of UJVNL (capacity larger than 25 MW). | 2002 | 78 | CSEB | 2005 |
| Phase – I Refurbishment of Hydel Unit No. 1 (1 x 40 MW) and other auxiliary systems of Panchet Hydel Power Station | 2002 | 80 | A&N Administration | 2008 |
| Consultancy Service for implementation of Indirasagar & Omkareshwar HE Projects | 2001 | 82 | SJVN | 2005 |
| Techno-Economic Feasibility Study of Earthen Dam to be constructed downstream of the existing concrete Dhanikhari Dam | 2001 | 84 | KPA | 2002 |
| Feasibility Study of Kalpong Downstream HE Project in North Andaman Island | 2001 | 86 | SJVN | 2004 |
| Contracts Management for E&M Works of NJHEP | 2001 | 88 | SJVN | 2004 |
| Operation & Maintenance Management of NJHEP | 2001 | 90 | SJVN | 2004 |
| Revamping and Uprating of one Unit & Refurbishment / repairing of cranes of Maithon HE Project | 2000 | 92 | PD, GoN | 2000 |
| Construction of Nganglam-Tintibi-Gelephu Single Circuit 132 KV Transmission Line on Turnkey Basis | 2000 | 94 | BBMB | 2005 |
| Evaluation of existing hydro power plants of Andhra Pradesh Generating company | 1999 | 96 | LAHDC | 2000 |
| Lenders Independent Engineer for Baspa - II HE Project (300MW) | 1999 | 98 | CWC | 1999 |
| Hydraulic Transient Studies | 1998 | 100 | NJPC/SJVN | 1999 |
| Annual Maintenance for Software packages in F&A Areas | 1998 | 102 | KSEB | 1997 |
| Geo-physical Investigations | 1997 | 104 | THDC | 1998 |
| Design and Investigation of Udhampur Katra Section Tunnels | 1997 | 106 | WBPDCL | 2001 |
| Flood Studies for Kahalgaon Super Thermal Power Project | 1996 | 108 | CES | 1996 |
| Development of IT Systems | 1994 | 110 | NJPC/SJVN | 1998 |