Operating Power Stations
NHPC is operating 22 Power Stations including Solar and Wind with installed capacity of 5551.20 MW and annual design energy of 23539 MU. Billing from these power stations during financial year 2022-23 was ₹ 7722.28 crores. The Power Stations of NHPC are located in Northern, Eastern and North-Eastern regions of the country. The list of Power Stations along with their details is as under.
S. No. | Name of Power Station | Installed Capacity (MW) | Design Energy (MU) | Location | Year of Commissioning | Capital Cost as on COD in ₹ (Cr) |
1. | Baira Siul | 180 | 779.28 | Himachal Pradesh | 1982 | 143.21 |
180 | 708.59 | 2021 | 303.37 | |||
2 | Loktak | 105 | 448.00 | Manipur | 1983 | 115.77 |
3 | Tanakpur | 94.2 | 452.19 | Uttarakhand | 1993 | 357.68 |
4 | Chamera-I | 540 | 1664.55 | Himachal Pradesh | 1994 | 1969.76 |
5 | Salal | 690 | 3082.00 | J&K | 1987/1995 | 803.41 |
6 | Uri-I | 480 | 2587.38 | J&K | 1997 | 3166.14 |
7 | Rangit | 60 | 338.61 | Sikkim | 2000 | 475.85 |
8 | Chamera-II | 300 | 1499.89 | Himachal Pradesh | 2004 | 1956.06 |
9 | Dhauliganga | 280 | 1134.69 | Uttarakhand | 2005 | 1631.40 |
10 | Dulhasti | 390 | 1906.80 | J&K | 2007 | 5078.49 |
11 | Teesta-V | 510 | 2572.70 | Sikkim | 2008 | 2619.60 |
12 | Sewa-II | 120 | 533.53 | J&K | 2010 | 1079.17 |
13 | Chamera-III | 231 | 1108.17 | Himachal Pradesh | 2012 | 1992.47 |
14 | Chutak | 44 | 212.93 | J&K | 2013 | 814.01 |
15 | Nimoo Bazgo | 45 | 239.33 | J&K | 2013 | 946.02 |
16 | TLDP-III | 132 | 594.07 | West Bengal | 2013 | 1790.43 |
17 | Uri-II | 240 | 1123.76 | J&K | 2014 | 2158.34 |
18 | Parbati-III | 520 | 701.40 (1963.29 after COD of Parbati-II) | Himachal Pradesh | 2014 | 2538.64 |
19 | TLDP-IV | 160 | 717.72 | West Bengal | 2016 | 1793.24 |
20 | Wind Power, Jaisalmer, Rajasthan | 50 | 94.25 | Rajasthan | 2016 | 302.5 |
21 | Solar Power (TANGENCO), TAMILNADU | 50 | 105.96 | Tamilnadu | 2018 | 273.68 |
22 | Kishanganga , J & K | 330 | 1712.96 | J&K | 2018 | 5704.23 |