Operating Power Stations
NHPC is operating 24 Power Stations including Solar and Wind with installed capacity of 7401.2 MW and annual design energy of 36049 MU. Billing from these power stations during financial year 2025-26 was ₹ 8807.82 crores. The Power Stations of NHPC are located in Northern, Eastern, South, West, and North-Eastern regions of the country. The list of Power Stations along with their details is as under.
| Sl. no. | Name of Power station | Installed Capacity (MW) | Design Energy (MU) | State / UT | COD year | Capital cost as on COD (Cr) |
| 1 | Baira Siul | 180 | 779.28 | Himachal Pradesh | 1982 | 143.21 |
| 2 | Loktak | 105 | 448.00 | Manipur | 1983 | 115.77 |
| 3 | Tanakpur | 94.2 | 452.19 | Uttarakhand | 1993 | 357.68 |
| 4 | Chamera-I | 540 | 1664.55 | Himachal Pradesh | 1994 | 1969.76 |
| 5 | Salal | 690 | 3082.00 | Jammu & Kashmir | 1987/1995 | 803.41 |
| 6 | Uri-I | 480 | 2587.38 | Jammu & Kashmir | 1997 | 3166.14 |
| 7 | Rangit | 60 | 338.61 | Sikkim | 2000 | 475.85 |
| 8 | Chamera-II | 300 | 1499.89 | Himachal Pradesh | 2004 | 1956.06 |
| 9 | Dhauliganga | 280 | 1134.69 | Uttarakhand | 2005 | 1631.40 |
| 10 | Dulhasti | 390 | 1906.80 | Jammu & Kashmir | 2007 | 5078.49 |
| 11 | Teesta-V | 510 | 2572.70 | Sikkim | 2008 | 2619.60 |
| 12 | Sewa-II | 120 | 533.53 | Jammu & Kashmir | 2010 | 1079.17 |
| 13 | Chamera-III | 231 | 1108.17 | Himachal Pradesh | 2012 | 1992.47 |
| 14 | Chutak | 44 | 212.93 | Laddakh | 2013 | 814.01 |
| 15 | Nimoo Bazgo | 45 | 239.33 | Laddakh | 2013 | 946.02 |
| 16 | TLDP-III | 132 | 594.07 | West Bengal | 2013 | 1790.43 |
| 17 | Uri-II | 240 | 1123.70 | Jammu & Kashmir | 2014 | 2158.34 |
| 18 | Prabati-III | 520 | 701.40 (1963.29 पारबती –II की COD के पश्चात) | Himachal Pradesh | 2014 | 2538.64 |
| 19 | TLDP-IV | 160 | 717.72 | West Bengal | 2016 | 1793.24 |
| 20 | Wind Power, Jaisalmer, Rajasthan | 50 | 94.25 | Rajasthan | 2016 | 302.5 |
| 21 | Wind Power (TANGENCO), Tamilnadu | 50 | 105.96 | Tamil Nadu | 2018 | 273.68 |
| 22 | Kishangana, J&K | 330 | 1712.96 | Jammu & Kashmir | 2018 | 5704.23 |
| 23 | Parbati-II | 800 | 3124.6 | Himachal Pradesh | 2025 | 13607.37 |
| 24 | Solar Power -Bikaner | 300 | 749.09 | Rajasthan | 2025 |