NIT No.:NH/CCW/CC-III/CO-465/PR11926/49
Construction of Civil works of Barrage & Stilling basin, River Diversion Arrangements, U/s Plastic cutoff trench, Power Intake Structures, Water Diversion Tunnel, outfall Structure, associated HM works including adit plugs and associated works of Chenab–Beas Link Tunnel Projects (Link-3) at Koksar, Lahaul-Spiti district of Himachal Pradesh
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 14-07-2026 | 24-07-2026 |
| Bid Opening Date | 28-07-2026 |
| Download Document |
Download PDF
( डाउनलोड | 461.04 KB | PDF | एडोबी रीडर या ब्राउज़र से खोलें) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| NH/CCW/CC-III/CO-465/PR11926/49 | Construction of Civil works of Barrage & Stilling basin, River Diversion Arrangements, U/s Plastic cutoff trench, Power Intake Structures, Water Diversion Tunnel, outfall Structure, associated HM works including adit plugs and associated works of Chenab–Beas Link Tunnel Projects (Link-3) at Koksar, Lahaul-Spiti district of Himachal Pradesh | 28-07-2026 | 24-07-2026 |
| No documents available | |||
Description:
Construction of Civil works of Barrage & Stilling basin, River Diversion Arrangements, U/s Plastic cutoff trench, Power Intake Structures, Water Diversion Tunnel, outfall Structure, associated HM works including adit plugs and associated works of Chenab–Beas Link Tunnel Projects (Link-3) at Koksar, Lahaul-Spiti district of Himachal Pradesh
No corrigendums available for this tender.