NIT No.:2025_NHPC_891839
Development of Micro Hydro Power Project (2X82KW) utilizing mandatory environmental- flow at exit location of Dam site of Parbati-III through the most economical PAT (Pump As Turbine) technology.
| Bid Submission Start Date | Bid Submission End Date |
|---|---|
| 05-01-2026 | 10-02-2026 |
| Bid Opening Date | 18-02-2026 |
| Download Document |
Download PDF
( डाउनलोड | 1.13 MB | PDF | एडोबी रीडर या ब्राउज़र से खोलें) |
| Works No. | Title | Bid Opening Date | End Date |
|---|---|---|---|
| Not available | Development of Micro Hydro Power Project (2X82KW) utilizing mandatory environmental- flow at exit location of Dam site of Parbati-III through the most economical PAT (Pump As Turbine) technology. | 18-02-2026 | 10-02-2026 |
| No documents available | |||
Description:
Development of Micro Hydro Power Project (2X82KW) utilizing mandatory environmental- flow at exit location of Dam site of Parbati-III Power Station, through the most economical PAT (Pump As Turbine) technology y.
No corrigendums available for this tender.