NIT No.:NH/DPS/CONT/NIT-234/2025/E139125 dated 12.03.2025
Modernization of Plumb-Line System by Supply and Installation of Automatic Plumb line System one at EL at 1212 m and two at EL 1250 m (XY Coordinator readout Charge Coupled Device and automatic data transmission to Dam Control Room) at Dul Dam, Dulhasti Kishtwar
Bid Submission Start Date | Bid Submission End Date |
---|---|
12-03-2025 | 03-04-2025 |
Bid Opening Date | 08-04-2025 |
Download Document |
Download PDF
( Download | 244.91 KB | PDF | Open with Adobe Reader or browser) |
Works No. | Title | Bid Opening Date | End Date |
---|---|---|---|
NH/DPS/CONT/NIT-234/2025/E139125 dated 12.03.2025 | Modernization of Plumb-Line System by Supply and Installation of Automatic Plumb line System one at EL at 1212 m and two at EL 1250 m (XY Coordinator readout Charge Coupled Device and automatic data transmission to Dam Control Room) at Dul Dam, Dulhasti Kishtwar | 08-04-2025 | 03-04-2025 |
Technical Specification | Login to Download | ||
NHPC Safety manual | Login to Download | ||
BOQ | Login to Download | ||
Complete tender document | Login to Download |
Description:
As per tender document
Corrigendum List
Sr No | Tender ID | Corrigendum | Details | Date | Expiry Date | Document |
---|---|---|---|---|---|---|
1 | 7918 | Corrigendum for extension of Design, Manufacturing and replacement of HV and LV Windings of 48.33MVA, 11/400/√3 KV, single phase Generator transformer of Unit #2 R-Phase (S.No.217620-02) and repair as per scope of work | Corrigendum for extension of Design, Manufacturing and replacement of HV and LV Windings of 48.33MVA, 11/400/√3 KV, single phase Generator transformer of Unit #2 R-Phase (S.No.217620-02) and repair as per scope of work | 22-03-2025 | N/A | Download |