NIT No.:2025_NHPC_844873_1
Selection of BESS Developers for setting up of 125MW / 500MWh InSTS connected standalone BESS in the state of Kerala under TBCB with VGF support (NHPC-Tranche-I-BESS) (2024-25)
Bid Submission Start Date | Bid Submission End Date |
---|---|
17-01-2025 | 14-02-2025 |
Bid Opening Date | 19-02-2025 |
Download Document |
Download PDF
( डाउनलोड | 1.82 MB | PDF | एडोबी रीडर या ब्राउज़र से खोलें) |
Works No. | Title | Bid Opening Date | End Date |
---|---|---|---|
NH/CCW/CC-I/CO-358/PR16924/34 | Selection of BESS Developers for setting up of 125MW / 500MWh InSTS connected standalone BESS in the state of Kerala under TBCB with VGF support (NHPC-Tranche-I-BESS) (2024-25) | 19-02-2025 | 14-02-2025 |
Tender Document | Login to Download |
Description:
NIT
Corrigendum List
Sr No | Tender ID | Corrigendum | Details | Date | Expiry Date | Document |
---|---|---|---|---|---|---|
1 | 7738 | Corrigendum No. 1 | Selection of BESS Developers for setting up of 125MW / 500MWh InSTS connected standalone BESS in the state of Kerala under TBCB with VGF support (NHPC-Tranche-I-BESS) (2024-25) | 01-02-2025 | N/A | Download |
2 | 7738 | Corrigendum No. 2 | Revised BOQ | 03-02-2025 | N/A | Download |
3 | 7738 | Corrigendum No. 3 | Corrigendum No. 3 | 10-02-2025 | N/A | Download |
4 | 7738 | Extension of Critical dates | 28-02-2025 | 28-02-2025 | Download | |
5 | 7738 | Corrigendum5 | Corrgendum5 Technical | 12-03-2025 | 12-03-2025 | Download |
6 | 7738 | Corrigendum6 | Corrigendum6 Extension of Critical dates | 13-03-2025 | N/A | Download |