NIT No.:2024_NHPC_836744_1

Construction work of check dam on left bank nallah at upstream of Uri-II Dam

Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date: Bid Submission End Date:
01-01-1970 01-05-1400
Bid Opening Date: 01-01-1970
Download Document Download PDF (opens in a new tab, PDF)
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. Title Bid Opening Date End Date
NH/Uri-II/CnP/24-25/126 Construction work of check dam on left bank nallah at upstream of Uri-II Dam 26-12-2024 18-12-2024
Login to Download

Description:

As per attached document