NIT No.:2026_NHPC_ 924051_1

Supply, Erection, testing and commissioning of Firefighting Pipe line at Runner and Turbine floor of Uri-II Power House

Bid Submission and Opening Details Table. It contains Bid Submission Start Date, Bid Submission End Date, Bid Opening Date, Download Document
Bid Submission Start Date Bid Submission End Date
29-08-2026 18-09-2026
Bid Opening Date 26-09-2026
Download Document Download PDF
( Download | 1.56 MB | PDF | Open with Adobe Reader or browser)
Work Specification
Work Specification Details Table. It contains Works Number, Title, Bid Opening Dat, End Date
Works No. Title Bid Opening Date End Date
NH/Uri-II/CnP/26-27/184 Supply, Erection, testing and commissioning of Firefighting Pipe line at Runner and Turbine floor of Uri-II Power House 26-09-2026 18-09-2026
Login to Download
Description:
As per Attached Document