| |
| River | Chenab |
| Location/District | On Chenab River Kishtwar district, UT of J&K |
| Dam/ Barrage | 65 m height (already constructed) |
| Intake | Already constructed , Size of Inteke Gate 7.0 (W)x 9.0m(H) |
| Desilting chamber | 2 Nos. , (Constructed identical each for Dulhasti Stage-I and Dulhasti Stage-II both at the time of construction of Dulhasti Stage I) |
| Head Race Tunnel | 01 No., Horse shoe., 8.5m dia , Length : 3685m |
| Surge Shaft | Restricted Orifice., Circular , 19.5m dia, 84.5m Height |
| Pressure Shaft | 1 no., 7.0m dia , Steel Lined, Circular Shape Length, 200m |
| Power House | Underground, 2 units of 130 MW each, Francis Turbine (vertical shaft) |
| Tail Race Tunnel | 1 no, 8.5m dia Horse Shoe Shape, Length : 215m |
| Net Head | 135.1 m |
| Annual generation | 1093.11MUs (90% dependable year) |