Sl. No. |
Description |
Client |
|
1. |
Development of EDP Systems |
SJVN
|
|
2. |
Flood Studies for Kahalgaon Super Thermal Power Project |
NTPC
|
|
3. |
Evaluation of offers for R&M Projects |
KSEB |
|
4. |
Geo-physical Investigations |
J&KPDC
|
|
5. |
Hydrological Studies - Flood Studies |
THDC |
|
6. |
FEM Analysis of Project Structure |
SJVN
|
|
7. |
Design and Investigation of Udhampur Katra Section Tunnels |
NR
|
|
8. |
E&M works for Lhunthsi mini Hydel project |
CWC |
|
9. |
Hydraulic Transient Studies |
TPA
|
|
10. |
Refraction Seismic Profiling |
CES
|
|
11. |
Dynamic Analysis of Water Conductor System |
SJVN |
|
12. |
Evaluation of existing hydro power plants of Andhra Pradesh
Generating company (Payment received in Foreign Currency) |
Sargent &
Lundy, USA |
|
13. |
Revamping and uprating of one unit & Refurbishment / repairing of cranes
of Maithon HE Project |
DVC |
|
14. |
Repair and Restoration of Spituk Monastery, Leh |
LAHDC
|
|
15. |
Preparation of Pre-feasibility Report for Tizu-Zungki HE Project
(150 MW) |
PD, GoN |
|
16. |
Annual Maintenance for Software packages in F&A Areas |
SJVN |
|
17. |
Techno-Economic Feasibility Study of Earthen
Dam to be constructed downstream of the existing concrete Dhanikhari Dam
|
A&N Admn. |
|
18. |
Operation & Maintenance
of Gyelpozhing-Gelephu Single Circuit 132 KV Transmission Line in Bhutan
|
KPA |
|
19. |
Construction of Nganglam-Tintibi-Gelephu
Single Circuit 132 KV Transmission Line on Turnkey Basis |
KPA |
|
20. |
Construction Management, Quality Control &
other services for Bakreshwar Thermal Power Project. Additional
Consultancy Services for tail channel and Electrical workshop Bakreshwar
Project. |
WBPDCL
|
|
21. |
Feasibility Study of Kalpong Downstream HE Project in North
Andaman Island |
A&N Admn. |
|
22. |
Design & Drawings for Vehicular Access at Nathpa &
Wadhal Adits of Head Race Tunnel for NJPC Project |
SJVN |
|
23. |
Assistance in Operation & Maintenance of Kalpong HE
Project (June’02 to Nov’ 02) |
A&N Admn. |
|
24. |
Survey & Investigation for setting up large Hydel Projects in Kaimur and
Munger Distt., Bihar – Reconnaissance Survey (Phase – I)
|
BHPC
|
|
25. |
Preparation of scope of work of HM Equipment of Gangrel
HE Project |
CSEB |
|
26. |
Detail
study of heightening of existing Dhanikhari Concrete Dam |
A&N Admn. |
|
27. |
Lenders Independent Engineer for Baspa - II HE Project (300MW) |
ICICI |
|
28. |
Commercial Management for Nathpa Jhakri Hydroelectric Power
Project (6 x 250 MW) |
SJVN |
|
29. |
Contracts Management for E&M Works of NJHEP |
SJVN
|
|
30. |
Design & Engg. of E&M Works of NJHEP |
SJVN |
|
31. |
Operation & Maintenance Management of NJHEP |
SJVN
|
|
32. |
Generating Equipment Review & Erection Review of NJHEP |
SJVN
|
|
33. |
Assistance in Operation & Maintenance of Kalpong HEP
(from Dec’02 – May’03) |
A&N Admn. |
|
34. |
Assistance in Operation & Maintenance of Kalpong HEP
(from June’ 03- Nov’ 03) |
A&N Admn. |
|
35. |
Assistance in Operation & Maintenance of Kalpong HEP
(from Dec’ 03- Nov’ 04) |
A&N Admn. |
|
36. |
Assistance in Operation & Maintenance of Kalpong HEP (from Dec’ 04- May’
05) |
A&N
Admn. |
|
37. |
Feasibility Study for Panchvati, Korang & Rangat Mini /
Micro Hydroelectric Projects in Andaman & Nicobar Island |
APWD |
|
38. |
Preparation of Detail Project Report of Kalpong D/S HEP
in A&N Islands |
A&N Admn. |
|
39. |
EIA & EMP studies for Dhanikhari Water Supply scheme,
Port Blair |
A & Admn. |
|
40. |
Association in Preparing & Filing of Petitions with
SERC / CERC for determination of tariff for energy generated from any
one hydroelectric project of UJVNL (capacity larger than 25 MW). |
UJVNL |
|
41. |
Preparation of PFRs for Development of Telharkund,
Sinafdar, Panchgotia and Hathiadah – Durgawati, fall sites as Pumped
Storage Schemes in Kaimur District, Bihar |
BHPC |
|
42. |
Survey of two Plots in Andaman Islands |
APWD |
|
43. |
Preparation of Preliminary Feasibility Reports of
Hydroelectric Projects as assigned by CEA |
CEA |
|
44. |
Works concerning dykes of all existing Ash Ponds at
Kolaghat Thermal Power Station, Dist. East Midnapore, West Bengal |
WBPDCL
|
|
45. |
Services as Independent Engineer for Baspa – II HE
Project (300 MW) |
JHPL |
|
46. |
Development of EDP & Communication Infrastrstructure
for NJHEP |
SJVN |
|
47. |
Preparation of PFR for installation of Conventional
Hydel unit at existing Konar Dam of DVC in District Hazaribagh,
Jharkhand. |
DVC |
|
48. |
Development of Software Packages in F&A Areas |
BBMB |
|
49. |
Turnkey Execution of Mahanadi Reservoir Project (4x2.5
MW) Mini Hydel Project (throughEPC Contractor) at Gangrel (Dhamtari) |
CSEB |
|
50. |
Contour Survey of Plot at Doodhline, Port Blair |
A&N
Admn. |
|
51. |
Development of Corporate Organization Structure and Assessment of
manpower needs for O&M of 1020 MW Tala Dam and Power Station, Bhutan |
THPA |
|
52. |
Preparation of PFR for Tamanthi HE Project in Myanmar |
MEA |
|
53. |
Inspection of major E&M equipment of the project of Gangrel Power House
(4x2.5 MW) of Mahanadi Reservoir Project in Chattisgarh |
CSEB |
|
54. |
Assistance in Operation & Maintenance of Kalpong HE Project for
twelve months (June’ 2005 – November’ 2005) |
A&N Admn. |